PENN STREET BRIDGE WORK
• The bridge is undergoing repairs that will last through December 2019
• The bridge WILL REMAIN OPEN during the repair period. There will be 1 lane entering and 2 lanes exiting the City of Reading.
• The bridge exit from 422 West will be closed.
SUGGESTED ALTERNATE ROUTES INCLUDE:
• From West Reading area take BUTTONWOOD ST, turn Right onto 5th St. and Right onto Washington St.
• From the north take Business 222/5th STREET, turn Right onto Washington St.
• From the South & East take the BINGAMAN ST BRIDGE to 5th street, turning Left onto Washington St.
Additional information available at http://www.readingbridges.net/
|
This theatre offers
ALL RESERVED SEATING
Guarantee your favorite seat!
Buy early at the boxoffice or online
|